Monday, June 18, 2012

Bathroom Update Part Two

The bathroom is nearly finished. All of the hard work is done. We've installed and grouted the porcelain floor tile and the shower floor. We installed the 6" x 6" white ceramic wall tile in the shower using a running bond or brickwork pattern because I thought this might be a little more special than using the typical grid pattern. We also added a 4" band of mosaic accent tile with metallic, white marble and glass accents. This was the happy accident I mentioned previously that I am quite happy with. We are at the midway point and here are some pictures to show our progress. 




As a reminder, this is the before picture. 
Next up will be the vanity, countertop, light fixture, toilet and shower door. This bathroom sure has come a long way. Looking forward to the finish line. 